Logistics Jacksonville, FL 24 months and ongoing
Jacksonville Distribution Center: Cargo Losses Cut $2.1M Annualized
A Jacksonville 3PL was losing cargo at the yard, dock, and inside the shift. Ranger's layered LP + yard-control program cut annualized losses by $2.1M in year one.
Measurable outcomes
Cargo losses (annualized)
-81%
Before: $2.6M
After: $0.5M
Cases closed w/ prosecution
+13
Before: 1
After: 14
Manifest discrepancies / week
-86%
Before: 22
After: 3
Recovery bounty tips
New channel
Before: 0
After: 9 actionable
The challenge
Yard trailer swaps, dock overloading discrepancies, and covert insider theft in the fulfillment shift. Prior program was gate-only.
Ranger's approach
- Yard officer verifying trailer/manifest at every gate event
- Dock supervisor and time-stamped seal verification
- Covert LP working the fulfillment floor on high-value shifts
- Anonymous tip line with recovery bounty
- Monthly loss report to VP of Operations