All case studies
Logistics Jacksonville, FL 24 months and ongoing

Jacksonville Distribution Center: Cargo Losses Cut $2.1M Annualized

A Jacksonville 3PL was losing cargo at the yard, dock, and inside the shift. Ranger's layered LP + yard-control program cut annualized losses by $2.1M in year one.

Share

Measurable outcomes

Cargo losses (annualized)
-81%
Before: $2.6M
After: $0.5M
Cases closed w/ prosecution
+13
Before: 1
After: 14
Manifest discrepancies / week
-86%
Before: 22
After: 3
Recovery bounty tips
New channel
Before: 0
After: 9 actionable

The challenge

Yard trailer swaps, dock overloading discrepancies, and covert insider theft in the fulfillment shift. Prior program was gate-only.

Ranger's approach

  • Yard officer verifying trailer/manifest at every gate event
  • Dock supervisor and time-stamped seal verification
  • Covert LP working the fulfillment floor on high-value shifts
  • Anonymous tip line with recovery bounty
  • Monthly loss report to VP of Operations

Related case studies

Share

Run a Ranger program like Jacksonville's

Talk to a supervisor. Get a written proposal with the same before/after metrics we'd track for you.