All case studies
Construction Fort Lauderdale, FL 22-month build cycle

Fort Lauderdale Vertical Build: Copper Theft Eliminated in 21 Days

A $180M mixed-use vertical build was losing $8k+ per week in copper and tools. Ranger's overnight + weekend program stopped losses inside 21 days.

Share

Measurable outcomes

Weekly theft losses
-100%
Before: $8,400
After: $0
After-hours trespass events
-92%
Before: 12/mo
After: 1/mo
Insurance premium (next term)
-11%
Before: Baseline
After: -11%
Subcontractor complaints
-100%
Before: 6/mo
After: 0

The challenge

Repeat overnight and Sunday theft of copper wire, catalytic converters from subcontractor trucks, and small tools. Prior vendor was cameras-and-alarms only.

Ranger's approach

  • Overnight Class D officer + marked patrol vehicle 6pm–6am
  • Weekend 24-hour stationed coverage
  • Two mobile light towers positioned per Ranger site survey
  • Contractor sign-in enforcement at perimeter
  • Coordinated response line with Fort Lauderdale PD ORC unit
"The overnight officer catches things our cameras never did. Losses stopped the week Ranger showed up."
Elena Ruiz
Owner, Ruiz Construction

Related case studies

Share

Run a Ranger program like Fort Lauderdale's

Talk to a supervisor. Get a written proposal with the same before/after metrics we'd track for you.